Friday, October 1, 2010

Hart Job in Keller

September 2010


Expanded shower both directions, built corner entrance door to shower, installed shower seat and recessed soap dish, mosaic band around tub splash with 6x6 tiles set on diagonal. 16x16 tub skirt & shower walls.




















Saturday, May 1, 2010

bridgeport-poolville







handi-cap shower stall 6x6& tub surround

Sunday, December 20, 2009

Desiree/Lewisville




Replaced bathtub, walls, floor, and faucets.

Saturday, November 21, 2009

Handicap Shower Remodel


Above: Handicap shower entrance, no curb with a built in
seating area and handicap bar.


Above: Tile floor with angled floor entrance.

Past remodels: Before and After,


Above: Finished shower entrance.


Above: Finished toilet area, with tile floor.



Above: Before shower area with rotting wood floor.

Above: Before rotting wood toilet area.